Case studies

London Underground Ltd

Forest Environmental Ltd have been a preferred contractor providing asbestos removal and environmental services to London Underground for the past 25 years. Forest Environmental have undertaken a wide variety of contracts across all areas of the London Underground infrastructure from stations and track to rolling stock and electrical sub stations.

Typical projects Forest Environmental have either lead or been involved in have included:

Track renewal projects

Contaminated ballast removal
Pit block removal
Cable troughing removal

Signalling, communications and power upgrade projects

Cable encapsulation and removal
Signal and electrical equipment case removal
Sub-ducting of asbestos cement ducts
Environmental clean of cable pits, cable ways and inverts

Rolling stock maintenance

Removal of damaged and redundant asbestos components
Strip down of resistor grids

Station refurbishment and modernisation

Removal of asbestos construction materials
Excavation of asbestos contaminated made-up ground

Sub Station equipment upgrade

Strip out of electrical equipment
Removal of asbestos construction materials

London Transport Museum

Removal and preservation of asbestos in heritage rolling stock, buses, electrical equipment etc.

Other case studies:

St James's Park - Newcastle United
Victoria Station
Mogden Sewage Treatment Works, Twickenham, Middlesex
Port of Felixstowe
London Underground Ltd
Bradwell Nuclear Power Station
BAA

image

 

image

 

Accreditations

All contents © Forest Environmental Limited 2008 Registered No. 02859847

Site Map     Terms and Conditions