Case studies
London Underground Ltd
Forest Environmental Ltd have been a preferred contractor
providing asbestos removal and
environmental services to London Underground for the
past 25 years. Forest Environmental have
undertaken a wide variety of contracts across all areas
of the London Underground infrastructure from
stations and track to rolling stock and electrical
sub stations.
Typical projects Forest Environmental have either
lead or been involved in have included:
Track renewal projects
Contaminated ballast removal
Pit block removal
Cable troughing removal
Signalling, communications and power upgrade projects
Cable encapsulation and removal
Signal and electrical equipment case removal
Sub-ducting of asbestos cement ducts
Environmental clean of cable pits, cable ways and inverts
Rolling stock maintenance
Removal of damaged and redundant asbestos components
Strip down of resistor grids
Station refurbishment and modernisation
Removal of asbestos construction materials
Excavation of asbestos contaminated made-up ground
Sub Station equipment upgrade
Strip out of electrical equipment
Removal of asbestos construction materials
London Transport Museum
Removal and preservation of asbestos in heritage
rolling stock, buses, electrical equipment etc.
Other case studies:
St James's Park - Newcastle
United
Victoria Station
Mogden Sewage Treatment
Works, Twickenham, Middlesex
Port of Felixstowe
London Underground Ltd
Bradwell Nuclear Power Station
BAA |